帮忙英语翻译,非常着急

我非常抱歉的告诉您套筒的两种样品没有办法按时交货,我们在检验的时候发现材料是有问题的,已经全部重新生产,重新生产要十二月中旬完成.我非常抱歉给您带来的不便.
滚子是没有问题的.
是否可以先把滚子出运 ?

这段话不是太职业。没有说清楚是进料的材料问题影响还是成品后才发现材料影响了套筒的样品生产。已经全部重做,那就是说原材料是没有问题,还是重新订构原材料?如果材料不验收就直接加工了的话,好像不符合流程。要是成品才发现有问题,那就不是材料的问题,是制造过程的问题。新的交付日期将是在二月中旬,这是比较专业说明的,但能说出具体日期才是最好的。

滚子,滚子是个什么东西?难道老外在下单的时候没有一个明确的Item名称,不可能吧?当然希望争取是否先把滚子发出去,征求别人意思是比较职业的,如果是和套筒配对用的东西的话,发出去也白发!

下面是我理解的进料材料有问题,正在赶紧处理材料问题,然后再加工生产力争12月某个具体的日期发货。

I'm so sorry for that the two model samples of sleeve won't be deliveryed on time. Because we found somes issues of its materials in IQC process. And now we are following up the case, the newest shipping date is on 15. Dec. Meanwhile the WHEEL is prepared for shipping, can we ship it first? I'm looking forward to hearing from you.

如有问题,还可以再问
温馨提示:答案为网友推荐,仅供参考
第1个回答  2012-11-28
I'm so sorry to inform you that the two samples of the your sleeve can not be delivered on time, we found that the materials had defects during our inspection, we have arranged to produce them again, and it will be completed on the mid of December, I'm sorry for any inconvenience.
The roller is OK.
Can we ship the rollers out first?本回答被网友采纳
第2个回答  2012-11-28
I feel sorry to tell you that two samples of this socket could not be delivery on time. We found it is the material problem when we tested. We have re-produced all of them and it will be finished around the middle of December, I feel sorry for any inconvenience caused.

There is no problem for rollers, pls check if we can delivery roller first?
第3个回答  2012-11-28
I am very sorry to tell you two types of socket samples can not be delivered on time,we found there were some problems with the materials when we were inspecting the samples. All of them have put into reproduction, and will be completed during mid -December. Sorry for causing you inconvenient.
There is no problem with the roller.
Can we ship the roller?
第4个回答  2012-11-28
I feel so sorry to tell you that we found out some problems when we checked the material,so the two kinds of sample sleeve can't be delivered on time.The sleeve is reproduced and will be completed at about middle of December.I am very sorry to bring you this trouble.
Ps,roller is no problem,so can it be delivered first?
第5个回答  2012-11-28
最后一位和推荐的答案比这个被你选了满意答案的好多了
汗 =.=
你不只是中文差,英文也不会分辨...
我只是无聊看到,提醒一下.